Staff Reporter|
Rosatom’s WindSGC JSC has obtained its permit for the construction of the Kuzminskaya wind farm.
The permit from the administration of the Kochubeyevskiy municipal disttrict of the Stavropol Krai will see the construction of a wind farm with a total capacity of 160 megawatts in the territory of Kochubeyevskiy urban district the Stavropol Krai.
WindSGC is part of Rosatom’s wind power division NovaWind.
According to the company, the permit was preceded by a positive opinion of the design document, expert examination and site investigation in respect of the wind farm construction that includes 64 wind turbines with a capacity of 2.5MW each.
“Successful expert examination confirms that the design documents for construction facilities comply with the site investigation results and the requirements specified in all technical regulations, in particular environmental, sanitary, epidemiological, fire safety requirements, regulatory and technical documentation and the Urban Development Code of the Russian Federation,” Rosatom said in a statement recently.
In the photo: A wind turbine.